Work on India’s first $15B bullet train starts in 2 years

India's first bullet train

Railway Minister proposed a bullet train on the Ahmedabad-Mumbai sector while presenting the new government’s first railway budget in Parliament.

Hope Pakistan too gets its first bullet train some time real soon.

The Mumbai-Ahmedabad corridor will be India’s first bullet train project. Here is all you need to know about it. via Business Today

  • The work on the Mumbai-Ahmedabad corridor is slated to begin by late 2017 or early 2018 and will be completed within six years.
  • The corridor will be 508 km long and the bullet train on this route will run at a speed of 320-350 kmph.
  • The project after completion will reduce the travel time from Mumbai to Ahmedabad to only two hours.
  • At present, Duronto Express takes about seven hours to cover the distance between the two financial centres.
  • According to Railway Minister, its fare will be less than airfare.
  • The five stations that will be covered on the bullet train route are Thane, Virar, Surat, Bharuch and Vadodara.
  • The project is to be built at an investment of Indian Rs 980 billion/ US$14.32 billion/ PKR 1.5 trillion will be funded by Japan. Japan International Cooperation Agency (JICA) will fund 81 per cent (about Indian Rs 793 billion) of the project on a soft loan for a period of 50 years and a moratorium of 15 years. The rate of interest on the loan will be 0.1 per cent.
  • Less than 20 per cent of the components required for the project will sourced from Japan, and that too will be manufactured in India.
  • Bandra-Kurla complex has been chosen for construction of the railway station for the bullet train in Mumbai. The station to be built three levels underground, thus will not interfere with the financial centre being planned there.

Railway Minister said feasibility studies for other high speed corridors have been awarded to various railway companies.

Delhi-Mumbai high speed corridor has been awarded to the consortium of the Third Railway Survey and Design Institute Group Corporation (Chinese consultant) and Lahmeyer International from India.

Feasibility study of high speed corridors on Mumbai- Chennai, Delhi-Kolkata, Delhi-Nagpur and Mumbai-Nagpur have also been awarded to different global consultants.

Prabhu said railways have identified nine corridors for feasibility of semi-high speed rail.

The semi-high speed routes are Delhi-Chandigarh, Chennai-Bengaluru-Mysore, Delhi-Kanpur, Nagpur-Bilaspur, Mumbai-Goa, Mumbai-Ahmedabad, Chennai-Hyderabad and Nagpur-Secunderabd. via Hindustan Times

See also on India

PM Nawaz Sharif’s India visit for Modi inauguration

Small change, big impact: Modi’s reforms

Key reforms facing PM Modi’s government

Indian-origin man, Iranian female win maths ‘Nobel’

A 16-year-old Indian finalist shines at Google Science Fair

Travel related:

Naya Pakistan: Travel from Pindi to Islamabad in 20¢ in wifi-ed AC bus

Green Line train from Islamabad to Karachi with free wifi

Rs 165B Orange Line Metro Train for Lahore

Rs15B Green Line metro bus project for Karachi announced

Welcome to China’s $225B One Belt, One Road (OBOR)

Shanghai Central Tower world’s second tallest building at 2,037ft

$46B China-Pakistan Economic Corridor: 15 years, 3 routes, 51 projects

The Turkish leap: High-speed train between Ankara and Istanbul

Saudi Arabia is building the world’s tallest tower

Makkah to have world’s largest & tallest hotel – in 2 years

Wow! Japan’s new floating train reaches 500kmph speed

World’s next highest railway bridge in Indian Kashmir

President Jokowi’s 9 priorities for Indonesia

Google will start making self-driving cars, ready in a year

AeroMobil hopes to launch flying car in 2017

Solar road could change how we power the world

Sky cars commercial by next year

How you will travel in 2024

Future of space travel not without risk!


Leave a Reply

Your email address will not be published. Required fields are marked *